OPTIMISING OPERATING COSTS IN INDUSTRIAL ENTERPRISES BY REDUCING THE DURATION OF PRODUCTION PROCESSES

Authors

  • Esheva Sarvinoz Axmatovna Independent researcher, Tashkent State University of Economics Author

Keywords:

cycle time, Little’s law, OEE, SMED, value-stream mapping, work in process, operating costs.

Abstract

The thesis examined how the duration of the production cycle in an industrial enterprise drives operating costs. Cycle time was split into processing, queue, setup and move time. Little’s law, the Kingman queueing approximation and overall equipment effectiveness (OEE) were combined into a model that prices work-in-process holding, changeovers, and overtime and idle time. The Central Bank key rate of 14% served as the capital-cost reference. In an illustrative (hypothetical) plant, cutting changeover time from 90 to 30 minutes and halving lot sizes reduced cycle time from 12.17 to 3.50 days, lowered annual cycle-time-related costs from UZS 810.2 million to UZS 310.2 million and released UZS 1.56 billion of working capital. Monthly monitoring of cycle time and pricing each day of it in investment decisions were proposed.

References

1.Stalk, G. (1988). Time: The next source of competitive advantage. Harvard Business Review, 66(4), 41–51. https://hbr.org/1988/07/time-the-next-source-of-competitive-advantage

2.National Statistics Committee of the Republic of Uzbekistan. (2026). Industrial production in January–December 2025 [press release]. https://stat.uz/img/news/press-reliz-sanoat-19_01_2026-j_-eng_p28348.pdf

3.UzDaily. (2026, November 4). Uzbekistan Central Bank keeps key rate at 14%. https://www.uzdaily.uz/en/uzbekistan-central-bank-keeps-key-rate-at-14-04-11-2026/

4.Little, J. D. C. (1961). A proof for the queuing formula: L = λW. Operations Research, 9(3), 383–387. https://doi.org/10.1287/opre.9.3.383

5.Hopp, W. J., & Spearman, M. L. (2011). Factory physics (3rd ed.). Long Grove, IL: Waveland Press. https://books.google.com/books?vid=ISBN9781577667391

6.Karmarkar, U. S. (1987). Lot sizes, lead times and in-process inventories. Management Science, 33(3), 409–418. https://doi.org/10.1287/mnsc.33.3.409

7.Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. https://books.google.com/books?vid=ISBN0915299038

8.McIntosh, R. I., Culley, S. J., Mileham, A. R., & Owen, G. W. (2000). A critical evaluation of Shingo’s SMED (Single Minute Exchange of Die) methodology. International Journal of Production Research, 38(11), 2377–2395. https://doi.org/10.1080/00207540050031823

9.Nakajima, S. (1988). Introduction to TPM: Total productive maintenance. Cambridge, MA: Productivity Press. https://books.google.com/books?vid=ISBN0915299232

10.Muchiri, P., & Pintelon, L. (2008). Performance measurement using overall equipment effectiveness (OEE): Literature review and practical application discussion. International Journal of Production Research, 46(13), 3517–3535. https://doi.org/10.1080/00207540601142645

11.Rother, M., & Shook, J. (1999). Learning to see: Value stream mapping to add value and eliminate muda. Brookline, MA: Lean Enterprise Institute. https://books.google.com/books?vid=ISBN0966784308

12.Womack, J. P., & Jones, D. T. (1996). Lean thinking: Banish waste and create wealth in your corporation. New York: Simon & Schuster. https://books.google.com/books?vid=ISBN0684810352

13.Shah, R., & Ward, P. T. (2003). Lean manufacturing: Context, practice bundles, and performance. Journal of Operations Management, 21(2), 129–149. https://doi.org/10.1016/S0272-6963(02)00108-0

14.Seth, D., & Gupta, V. (2005). Application of value stream mapping for lean operations and cycle time reduction: An Indian case study. Production Planning & Control, 16(1), 44–59. https://doi.org/10.1080/09537280512331325281

Downloads

Published

2026-11-12