EVALUATION OF THE FINANCIAL EFFICIENCY OF RENEWABLE ENERGY PROJECTS USING THE EXAMPLE OF A 20 kW SOLAR PHOTOVOLTAIC PLANT
Keywords:
solar photovoltaic power plant, self-consumption, financial efficiency, NPV, IRR, LCOE, payback period.Abstract
The article evaluates the financial efficiency of a 20 kW class solar photovoltaic power plant installed in a parking structure on the territory of the National Research Institute of Renewable Energy Sources based on real operational data. The plant consists of 45 Green Sun Solar photovoltaic modules with a power of 410 W, and the total nominal DC power of the modules is 18.45 kWp. In January-July 2026, the plant generated 13,600 kWh of electricity. 100% of the generated energy was directed to cover the internal electricity consumption of the institute. The financial assessment used net present value (NPV), internal rate of return (IRR), levelized cost of electricity (LCOE), and discounted payback period (DPP). The baseline calculation resulted in an NPV of 88.7 million soums, an IRR of 28.4%, an LCOE of 542 soums/kWh, and a discounted payback period of 4.75 years. The results showed that on-site consumption of the generated electricity is a cost-effective model for small-scale photovoltaic power plants.
References
1.International Renewable Energy Agency (IRENA). Renewable Power Generation Costs in 2024. Abu Dhabi: IRENA, 2025. ISBN 978-92-9260-669-5.
2.O‘zbekiston Respublikasi Vazirlar Mahkamasining 2026-yil 15-maydagi 243-son qarori. Yoqilg‘i-energetika resurslari narxlarini belgilash to‘g‘risida. – Toshkent, 2026.
3.O‘zbekiston Respublikasi Energetika vazirligi. Quyosh paneli orqali ishlab chiqarilgan elektr energiyasini elektr tarmog‘iga sotish tartibi va tariflari to‘g‘risidagi ma’lumot. – 2025-yil 9-yanvar.
4.O‘zbekiston Respublikasi Energetika vazirligi. Respublikada kichik quvvatli quyosh fotoelektr qurilmalarini joriy etish va ularning elektr energiyasi ishlab chiqarish ko‘rsatkichlari. – 2026-yil 21-aprel.
5.Qayta tiklanuvchi energiya manbalari milliy ilmiy-tadqiqot instituti. 20 kW sinfidagi avtoturargoh quyosh fotoelektr stansiyasining 2026-yil yanvar–iyul oylari uchun monitoring ma’lumotlari. – Toshkent, 2026.




United Kingdom
Germany
France
Uzbekistan
Türkiye
Kazakhstan
Kyrgyzstan
Turkmenistan
Azerbaijan
India
Republic of Korea
Japan
United States of America
Kosovo
Italy
Spain
Poland
Netherlands
Belgium
Sweden
Norway
Finland
Denmark
Switzerland
Austria
Czech Republic
Hungary
Romania
Bulgaria
Greece
Portugal